Education
Education
Using an integrated design and construction process centered around BIM, schools demonstrates that high-quality bespoke school solutions can be procured and delivered within reduced budgets and the constrained timeframes demanded by the need for new school places. We at ODE are proud to have associated with numerous projects where BIM was implemented for schools and university buildings.
Sabah Al Salem Kuwait University, Six Department Buildings, Kuwait
Location: Kuwait
Area: 195,000 Sqmt
Stage: Construction
Scope: BIM- Arch. Struc. MEP Services
Located in Sabah-Al-Salem University City this is one of the largest education city in the world.
ODE carried out BIM work for six colleges within this campus. Each building comprised of G+5 structure and a roof where all AHUs were located. All riser layouts for services was carried out in BIM.
Queens University Belfast
Location: Belfast, United Kingdom
Area: 3,700 Sqmt
Stage: RIBA Stage 3 to 4
Scope: BIM- MEP Services
The Northern Ireland Advanced Composites and Engineering Centre (NIACE) is a 3,700 m² 3-storey purpose-built facility.The centre comprises a collaborative office environment, a composites research laboratory, materials analysis laboratories, meeting rooms, lecture theatres, and a sophisticated comms room to link the facility to other similar organizations worldwide.es
ODE carried out BIM work for all services comprising the distribution to areas, AHU and plant room space layouts.
Oxford Brookes University Headington
Location: Headington, United Kingdom
Area: 65,000 Sqmt
Stage: RIBA Stage 4 to 5
Scope: BIM- MEP Services
The Clerici redevelopment project of Oxford Brookes University was a part of £220 million investment to further improve its campuses. This project comprised thirty new teaching rooms, a collaborative lecture theatre, social learning spaces and the Sir Kenneth Wheare Hall - a flexible and dynamic space for teaching and events.
ODE carried out BIM work from technical design to construction stage for the building services contractor. Many design elements were changed and the BIM work was carried out to precision by removing existing clashes, rerouting and resizing of services wherever ceiling space was a constraint.
Marjory Kinnon, Special Education Needs School London
Location: London, UK
Area: 9,500 Sqmt
Stage: RIBA Stage 3 to 4
Scope: BIM- Electrical Services
Marjory Kinnon School is a popular all age special school for children aged 4-16 years The school located in Feltham close to Heathrow Airport, is a 2-storey build with over 9,500m² of teaching space and caters for 288 pupils.
ODE carried out BIM work for all electrical services like Lighting, Small power, Containment, Fire alarm, Security, Clock services, Intruder prevention system, Panel schedules and circuiting.
Gresham, Special Education Needs School London
Location: London, UK
Area: 8,500 Sqmt
Stage: RIBA Stage 3 to 4
Scope: BIM- Electrical Services
The Gresham school is a 3-story build with a floor area of 8,500m² and caters to 224 pupils with severe and multiple learning difficulties.
ODE carried out BIM work for all electrical services like lighting, small power, containment, fire alarm, Security, Clock services, Intruder prevention system, Panel schedules, and circuiting.
Clark County School District Las Vegas
Location: Las Vegas, USA
Area: 102,000 Sqft
Stage: Design Development
Scope: BIM- MEP Services
Galleria and Dave Wood Elementary School comprise a new $28.5 million campus consisting of 53 classrooms spread over two classroom buildings, one administration block, and a multi-purpose building for physical education, cafeteria, band, orchestra, and the arts to serve up to 850 students.
ODE carried out BIM work for all services, AHU, and plant room space layouts. The work consisted of soft design support as there were substantial changes in layout. The work was done collaboratively with the Building services designers.
Hujjat Primary School London
Location: London, UK
Area: 6,500 Sqmt
Stage: RIBA Stage 2 to 4
Scope: BIM- MEP services & COBIE
Hujjat Primary school, Harrow's first Muslim faith free school is located in an impressive 1930s building in Brookshill Harrow Weald, which was a former grammar school. The project involved comprehensive refurbishment and upgrade to the building, to enable its character to be retained, while delivering state-of-the-art facilities.
ODE carried out BIM work for all MEP services and COBIE documentation. This included the floor layouts, plant rooms and schematics.
Wren School Dublin
Location: Dublin, Ireland
Details: Residential development scheme
Stage: RIBA Stage 2
Scope: 4D Sequencing of construction
Cherrywood town is nestled at the foot of South Dublin’s rolling mountains, and just above Dublin Bay.
ODE carried out the 4D construction sequencing for the complete development.
Clark County School District, Chapata Drive Las Vegas
Location: Las Vegas, USA
Area: 90,400 Sqft
Stage: Design Development
Scope: BIM- Electrical Services
The Project consists of the K-5 facility on a 10-acre lot and caters to 720 students. The facility consists of one 1 story and one 2 story building in all comprising of 46 classrooms.
ODE carried out BIM work for all electrical services like Lighting, Small power, Containment, Fire alarm, Security, Clock services, Intruder prevention system, Panel schedules and circuiting.